aurecon provided services to waterways constuctions as a verifier of temporary Parks for the construction of a renewed major sewer crossing below the yarra river. matthew killian attended site and reviewed documentation prepared by Waterways constructions’ design team to provide assurance to melbourne water that the works were safe at met their prescribed standards.
project client: melbourne water
client: waterway constructions
designer: waterway constructions
consultant: aurecon (sureside’s matthew killian)
contractor: waterway constructions
service: technical oversight, construction phase services & certification
Location: south wharf / metropolitant melbourne / river yarra
time period: 2007







