Rye Pier As-builts

Preparation of as-built drawings for Stage One of the Rye Pier Reconstruction. The Project was delivered by Parks Victoria.

project client: parks victoria

sureside client: gtk constructions

location: rye, mornington peninsula, victoria, australia

time period: 2022