Gem Pier Fender Replacement

Sureside provided services to parks victoria. parks victoria had the fendering system compromised by works repairing piles and/or preserving piles and walers.

due to limitations in the original structure and so as to not impact upon pile repair works an unconventional solution was required for this asset. sureside identified limitations in the structure and developed a system that worked within constraints. this process required significant iterations in order to ensure the system met minimum system requirements.

project client: parks victoria

sureside client: parks victoria

subconsultant: fsc range

location: williamstown, metropolitan melbourne, victoria, australia

services: functional design system

time period: 2021