KBR provided design services for the reconstruction of Half Moon Bay boat ramp. This included a review of options aimed at achieving maximum value for money to council. KBR used its own guidelines for facility design to make maximum benefit from learnings it has taken from past audit efforts of these types of facility. Matthew killian prepared all reporting and supervised the design.
project client: bayside city council
consultant: kellogg, brown & root
services: existing asset renewal, options study & functional design
Location: black rock, metropolitan melbourne, port phillip, victoria, australia
time period: 2014







