Banana Alley Pontoon Connection Review

Sureside provided services to Parks Victoria. Parks Victoria were seeking technical advisors to assess connection details proposed by Bellingham Marine for a Timber Landing on the Yarra. Sureside reviewed proposed connection details and made recommendations to ensure landing stability and to amend proposed connections so that loading scenarios could be reliably determined.

pile lateral testing was undertaken by golder associates to substantiate pile integrity specifically in regard to founding conditions which were anticipated to be varable over the site.

project client: parks victoria

sureside client: parks victoria

geotechnical engineer: golder Associates

services: existing asset renewal, functional design & Technical advisory

Location: melbourne, metropolitan melbourne, river yarra, victoria, australia

time period: 2020-21