Cruise ship terminal design integrates typical wharf design with the added element of incorporating passenger decanting equipment that is suitable for the calling fleet.
relevant projects delivered by sureside are presented below. click on the links to see more about those projects. projects shown in aqua pre-date sureside (referring to our founding director’s prior project experience).

station pier upgrade (under construction)
the links below shall take you to other relevant sections of our website.

















